Keith Hunt Park (Labrador)

Help shape the Keith Hunt Park Master Plan

Following community consultation in April 2026, we have prepared a draft master plan to guide the long-term future of Keith Hunt Park in Labrador. Keith Hunt Park is the proposed venue for the hockey competition during the Brisbane 2032 Olympic Games (the Games).

The draft master plan responds to Games requirements while creating lasting benefits for the community and local sporting clubs beyond 2032. The vision is for Keith Hunt Park to be a welcoming destination where sport, everyday recreation and nature come together, with better connections to surrounding neighbourhoods and destinations.

Image: Keith Hunt Park today

Map of Keith Hunt Park showing the master plan area highlighted across sports fields, open space, and surrounding streets.


We asked how you used Keith Hunt Park and what could be improved. You can learn more in the engagement report. This feedback, together with feedback from key stakeholders, technical investigations, Games requirements and site constraints, has helped shape the draft master plan.

What does the draft master plan propose?

  • a revised sporting field layout and improvements to sporting facilities to make better use of available space, support existing sporting clubs and accommodate a third hockey pitch as part of planning for the Games
  • a new, high-quality shared football clubhouse to replace and consolidate the two existing clubhouses and better support the park’s football clubs
  • increased parking and improved access and connections to support the revised layout, increase car parking overall and make it safer and easier to move through the park
  • a safer and more welcoming park, with improved entries, lighting, sightlines and a new arrival plaza at the Gold Coast Hockey Centre
  • a new community recreation area following the Games, transforming the existing internal car park and surrounding area into a place for everyday recreation and socialising.

Have your say

We want to hear what you think of the draft master plan, including:

  • what you would most like to see included in the new community recreation area
  • how the proposed changes would affect the way you use the park
  • your views on the overall draft master plan.

Complete the survey for a chance to win one of 3 $50 gift vouchers (terms and conditions apply).

Have Your Say from Thursday 12 November to Friday 4 December 2026.


Draft Keith Hunt Park Master Plan

The following images are indicative only. Your feedback will be considered alongside technical and planning requirements, site constraints, safety considerations and available funding as the master plan is finalised.


Getting to and around the park

We heard: parking, traffic and pedestrian safety could be improved, along with park entries, lighting and walking connections.

The draft master plan proposes to:

  • increase overall car parking by more than 100 spaces
  • remove the existing internal access road and car park adjoining the Gold Coast Hockey Centre
  • relocate parking to the street frontages, with new car parks provided off Musgrave Avenue and Kumbari Avenue
  • upgrade the existing football car park, increasing parking and introducing one-way vehicle movement
  • remove 3 on-street parking spaces on Musgrave Avenue to improve safety
  • create a new arrival plaza at the Gold Coast Hockey Centre and improve other key park entries
  • improve shared paths, lighting and sightlines along key routes through the park
  • underground and realign the existing drainage channel further east, beneath the multi-use grass sports fields.

These changes will improve access, safety and connections across the park, while making better use of available space for sport and recreation.


Improving sporting facilities

We heard: that supporting existing sporting clubs and improving fields and facilities are key priorities.

The draft master plan proposes to:

  • reconfigure and improve sporting fields to make better use of the available space
  • replace and consolidate the two existing clubhouses with a new, high-quality shared football clubhouse
  • provide a new (third) hockey pitch
  • upgrade sporting infrastructure, such as lighting, fencing and spectator seating.

Final field layouts and supporting infrastructure, including the new shared football clubhouse, lighting, seating, fencing and other park elements, will be developed through detailed design in close consultation with existing club users to ensure facilities meet their operational needs.

The location of the new hockey pitch responds to Games requirements, including the need to retain sufficient surrounding space for temporary spectator seating, supporting infrastructure and safe access.


Making better use of the park

We heard: you wanted the available space across the park to be used more effectively, with upgraded facilities and more opportunities for recreation and socialising.

The draft master plan proposes to:

  • create more usable space by removing the internal road and car park, and undergrounding and realigning the existing open drainage channel
  • reconfigure sporting and recreation areas to make better use of available space
  • create more welcoming park entries and arrival areas
  • improve lighting across the park to extend opportunities for sport and recreation
  • provide additional flexible open space and multi-use areas
  • remove the underused skate bowl, with skate park upgrades planned for nearby Collingwood Court, in accordance with the City's Skate Plan
  • remove the existing caretaker cottage near the Gold Coast Hockey Centre.

Help shape the proposed new community recreation area

Relocating car parking to the park’s street frontages creates an opportunity to transform the existing internal car park and surrounding area into a new community recreation area following the Games.

Please tell us what you would most like to see included in the new community recreation area.

Potential features could include:

  • playground
  • basketball courts and multi-purpose courts
  • learn-to-ride area
  • picnic shelters and seating
  • outdoor fitness equipment.

The final mix of facilities will depend on community feedback, site constraints, including the site’s flood-storage requirements, funding and approvals. The community recreation area needs to remain relatively open, with uses and facilities that can withstand flooding from time to time, so buildings and significant infrastructure are not proposed.


Have your say

Provide your feedback on the draft master plan by:

  • completing the online survey
  • attending a community pop-up:
    • Tuesday 17 November, 4:00pm - 6:00pm at Keith Hunt Park, near the Gold Coast Hockey Club car park
    • Sunday, 22 November, 11:00am - 2:00pm at Club Musgrave Bowls Club
    • Friday 27 November, 6:00am - 9:00am at Chirn Park shops, near Daark Espresso

Pop-up dates may change due to unforeseen circumstances. Please check this page before attending.

Complete the survey for a chance to win one of 3 $50 gift vouchers (terms and conditions apply).

Consultation closes 4 December 2026.

Help shape the Keith Hunt Park Master Plan

Following community consultation in April 2026, we have prepared a draft master plan to guide the long-term future of Keith Hunt Park in Labrador. Keith Hunt Park is the proposed venue for the hockey competition during the Brisbane 2032 Olympic Games (the Games).

The draft master plan responds to Games requirements while creating lasting benefits for the community and local sporting clubs beyond 2032. The vision is for Keith Hunt Park to be a welcoming destination where sport, everyday recreation and nature come together, with better connections to surrounding neighbourhoods and destinations.

Image: Keith Hunt Park today

Map of Keith Hunt Park showing the master plan area highlighted across sports fields, open space, and surrounding streets.


We asked how you used Keith Hunt Park and what could be improved. You can learn more in the engagement report. This feedback, together with feedback from key stakeholders, technical investigations, Games requirements and site constraints, has helped shape the draft master plan.

What does the draft master plan propose?

  • a revised sporting field layout and improvements to sporting facilities to make better use of available space, support existing sporting clubs and accommodate a third hockey pitch as part of planning for the Games
  • a new, high-quality shared football clubhouse to replace and consolidate the two existing clubhouses and better support the park’s football clubs
  • increased parking and improved access and connections to support the revised layout, increase car parking overall and make it safer and easier to move through the park
  • a safer and more welcoming park, with improved entries, lighting, sightlines and a new arrival plaza at the Gold Coast Hockey Centre
  • a new community recreation area following the Games, transforming the existing internal car park and surrounding area into a place for everyday recreation and socialising.

Have your say

We want to hear what you think of the draft master plan, including:

  • what you would most like to see included in the new community recreation area
  • how the proposed changes would affect the way you use the park
  • your views on the overall draft master plan.

Complete the survey for a chance to win one of 3 $50 gift vouchers (terms and conditions apply).

Have Your Say from Thursday 12 November to Friday 4 December 2026.


Draft Keith Hunt Park Master Plan

The following images are indicative only. Your feedback will be considered alongside technical and planning requirements, site constraints, safety considerations and available funding as the master plan is finalised.


Getting to and around the park

We heard: parking, traffic and pedestrian safety could be improved, along with park entries, lighting and walking connections.

The draft master plan proposes to:

  • increase overall car parking by more than 100 spaces
  • remove the existing internal access road and car park adjoining the Gold Coast Hockey Centre
  • relocate parking to the street frontages, with new car parks provided off Musgrave Avenue and Kumbari Avenue
  • upgrade the existing football car park, increasing parking and introducing one-way vehicle movement
  • remove 3 on-street parking spaces on Musgrave Avenue to improve safety
  • create a new arrival plaza at the Gold Coast Hockey Centre and improve other key park entries
  • improve shared paths, lighting and sightlines along key routes through the park
  • underground and realign the existing drainage channel further east, beneath the multi-use grass sports fields.

These changes will improve access, safety and connections across the park, while making better use of available space for sport and recreation.


Improving sporting facilities

We heard: that supporting existing sporting clubs and improving fields and facilities are key priorities.

The draft master plan proposes to:

  • reconfigure and improve sporting fields to make better use of the available space
  • replace and consolidate the two existing clubhouses with a new, high-quality shared football clubhouse
  • provide a new (third) hockey pitch
  • upgrade sporting infrastructure, such as lighting, fencing and spectator seating.

Final field layouts and supporting infrastructure, including the new shared football clubhouse, lighting, seating, fencing and other park elements, will be developed through detailed design in close consultation with existing club users to ensure facilities meet their operational needs.

The location of the new hockey pitch responds to Games requirements, including the need to retain sufficient surrounding space for temporary spectator seating, supporting infrastructure and safe access.


Making better use of the park

We heard: you wanted the available space across the park to be used more effectively, with upgraded facilities and more opportunities for recreation and socialising.

The draft master plan proposes to:

  • create more usable space by removing the internal road and car park, and undergrounding and realigning the existing open drainage channel
  • reconfigure sporting and recreation areas to make better use of available space
  • create more welcoming park entries and arrival areas
  • improve lighting across the park to extend opportunities for sport and recreation
  • provide additional flexible open space and multi-use areas
  • remove the underused skate bowl, with skate park upgrades planned for nearby Collingwood Court, in accordance with the City's Skate Plan
  • remove the existing caretaker cottage near the Gold Coast Hockey Centre.

Help shape the proposed new community recreation area

Relocating car parking to the park’s street frontages creates an opportunity to transform the existing internal car park and surrounding area into a new community recreation area following the Games.

Please tell us what you would most like to see included in the new community recreation area.

Potential features could include:

  • playground
  • basketball courts and multi-purpose courts
  • learn-to-ride area
  • picnic shelters and seating
  • outdoor fitness equipment.

The final mix of facilities will depend on community feedback, site constraints, including the site’s flood-storage requirements, funding and approvals. The community recreation area needs to remain relatively open, with uses and facilities that can withstand flooding from time to time, so buildings and significant infrastructure are not proposed.


Have your say

Provide your feedback on the draft master plan by:

  • completing the online survey
  • attending a community pop-up:
    • Tuesday 17 November, 4:00pm - 6:00pm at Keith Hunt Park, near the Gold Coast Hockey Club car park
    • Sunday, 22 November, 11:00am - 2:00pm at Club Musgrave Bowls Club
    • Friday 27 November, 6:00am - 9:00am at Chirn Park shops, near Daark Espresso

Pop-up dates may change due to unforeseen circumstances. Please check this page before attending.

Complete the survey for a chance to win one of 3 $50 gift vouchers (terms and conditions apply).

Consultation closes 4 December 2026.

  • Phase 1 Consultation

    Help shape the future of Keith Hunt Park

    The City of Gold Coast (City) is preparing a master plan for Keith Hunt Park in Labrador to guide the park’s future.

    Keith Hunt Park is a much‑loved community and sporting destination. The master plan will set a long‑term vision to ensure the park continues to meet the needs of residents, sporting clubs and visitors into the future.

    Why is the City undertaking this project?

    The Gold Coast Hockey Centre, located within Keith Hunt Park, is proposed to host the hockey competition for the Olympic and Paralympic Games Brisbane 2032 (the Games).

    The Keith Hunt Park Master Plan will ensure the park can meet the Games requirements, while exploring opportunities to create a lasting legacy that enhances the park experience well beyond 2032.

    The project also responds to:

    • increasing demand for sporting fields and open space
    • ageing infrastructure
    • opportunities to better support community recreation, sport and visitors.

    The master plan will help guide future upgrades and improvements.

    Master Plan area

    The Keith Hunt Park Master Plan will cover the full extent of Keith Hunt Park, including the Gold Coast Hockey Centre, surrounding open spaces and sporting fields. This includes areas used by the Gold Coast Over 35 Soccer Association Inc (Legends Football Club) and the Musgrave Mustangs Football Club.

    The highlighted area below shows the land included in the Master Plan.

    Map of Keith Hunt Park showing the master plan area highlighted across sports fields, open space, and surrounding streets.

    What will the master plan consider?

    The long‑term vision and master plan for Keith Hunt Park will focus on:

    • improving park facilities, open spaces and access
    • supporting current and future sporting needs
    • enhancing the park’s existing natural and community values
    • improving the experience for residents, sporting clubs and visitors.

    Have your say

    We want to hear from people who use and value Keith Hunt Park.

    Your feedback will help identify:

    • what works well in the park
    • what could be improved
    • ideas and opportunities for the park’s future.

    Community input will be considered alongside technical investigations and Council requirements to help shape the draft master plan.

    Consultation is open from 7 to 28 April 2026.

    Have your say by:

    • completing the online survey below
    • attending a community pop-up
      • Saturday, 11 April from 8am − 11am (Near the Gold Coast Hockey Centre)
      • Wednesday, 22 April from 4pm − 7pm (Near the Musgrave Mustangs Football Club)

    Help shape the future of Keith Hunt Park

    The City of Gold Coast (City) is preparing a master plan for Keith Hunt Park in Labrador to guide the park’s future.

    Keith Hunt Park is a much‑loved community and sporting destination. The master plan will set a long‑term vision to ensure the park continues to meet the needs of residents, sporting clubs and visitors into the future.

    Why is the City undertaking this project?

    The Gold Coast Hockey Centre, located within Keith Hunt Park, is proposed to host the hockey competition for the Olympic and Paralympic Games Brisbane 2032 (the Games).

    The Keith Hunt Park Master Plan will ensure the park can meet the Games requirements, while exploring opportunities to create a lasting legacy that enhances the park experience well beyond 2032.

    The project also responds to:

    • increasing demand for sporting fields and open space
    • ageing infrastructure
    • opportunities to better support community recreation, sport and visitors.

    The master plan will help guide future upgrades and improvements.

    Master Plan area

    The Keith Hunt Park Master Plan will cover the full extent of Keith Hunt Park, including the Gold Coast Hockey Centre, surrounding open spaces and sporting fields. This includes areas used by the Gold Coast Over 35 Soccer Association Inc (Legends Football Club) and the Musgrave Mustangs Football Club.

    The highlighted area below shows the land included in the Master Plan.

    Map of Keith Hunt Park showing the master plan area highlighted across sports fields, open space, and surrounding streets.

    What will the master plan consider?

    The long‑term vision and master plan for Keith Hunt Park will focus on:

    • improving park facilities, open spaces and access
    • supporting current and future sporting needs
    • enhancing the park’s existing natural and community values
    • improving the experience for residents, sporting clubs and visitors.

    Have your say

    We want to hear from people who use and value Keith Hunt Park.

    Your feedback will help identify:

    • what works well in the park
    • what could be improved
    • ideas and opportunities for the park’s future.

    Community input will be considered alongside technical investigations and Council requirements to help shape the draft master plan.

    Consultation is open from 7 to 28 April 2026.

    Have your say by:

    • completing the online survey below
    • attending a community pop-up
      • Saturday, 11 April from 8am − 11am (Near the Gold Coast Hockey Centre)
      • Wednesday, 22 April from 4pm − 7pm (Near the Musgrave Mustangs Football Club)
Page last updated: 16 Nov 2026, 09:21 AM